Non-Conforming Material Policy

End User Complaints to Almetals
I.
Timeliness
A.
Non-oxidation
claims on material shipped over ninety (90) days is
purchaser's responsibility, Almetals will not accept
any claim shipped over this time limit.
When
metal is shipped with polyfilm
in coil form, Almetals will only accept claims in
coil form with the following exception:
Exception: Almetals will only accept claims of blanks or parts in
cases where samples of defect are provided, and the manufacturer of the polyfilm agrees that the film is defective after inspection
of samples, and the manufacturer of the polyfilm
agrees to reimburse for all cost associated with the claim.
B.
Oxidation claims
or water stain claims on unprotected material.
Will be reviewed if notified within thirty (30) days of ship date. Almetals will not
accept any oxidation claims shipped over thirty (30) days. Further restrictions on oxidation claims are listed below (Section IX).
II.
Notification to Almetals
Almetals
must be notified, in writing, of any claim as soon as
possible, so that Almetals can start the reviewing
process, and make sure all material necessary can be contained. The notification should be
sent in to the Quality Control Department, or to the end user's Account
Representative or Inside Sales Representative.
This
may be mailed to:
Almetals
51035 Grand River
Wixom, MI 48393
Faxed to: 248-348-7627
Emailed to: quality@almetals.com
III.
Information
Required
The
initial notification to Almetals must indicate the Almetals Lot Identification Sticker
numbers. These stickers are located on
both the I.D. and O.D. of each slit coil that leaves
our building. Other information that
will help expedite Almetals' internal investigation includes
the Case Ticket number of the skid.
There
should also be a succinct description of the material in terms of Product,
Gauge, Width, Number of Cuts, and Shipped Date and Weight, as well as weight of
rejected material.
Lastly,
a clear description of the defect is necessary.
IV.
Sample
A
sample of material clearly showing the defect is required. If a sample of the material cannot be provided, digital pictures clearly showing the
defect may be accepted. Pictures should be e-mailed
to quality@almetals.com. We will notify end user as to the method to ship the
sample within 24 hours of receiving the Information required detailed in
Section III.
V.
Issuance of
Disposition
Upon
inspection of all documentation, as well as the sample of the defect, Almetals will issue a written disposition. The response will be sent
out within three (3) days of receiving all of the Required Information
detailed in Section III, and the Sample detailed in Section IV:
A.
Acceptance of
Claim/Return
Almetals
will issue an RMR (Return Material Release). This document will state what material type,
gauge, width, and weight is being returned. It will have a specific RMR
number at the top that must be referenced on any
return documentation. It will also
detail how the material is to be returned (our truck,
customer drop off, a specific freight line, etc.)
Any
material returned to Almetals prior to this RMR being authorized and issued
will be denied entrance and returned to the end user at their own expense.
B.
Acceptance of
Claim/Scrap
Almetals
will issue an RMR (Return Material Release). This document will state what material type,
gauge, width and weight are to be scrapped. It will have a specific RMR
number at the top that must be referenced on any Debit
paperwork. It will also state, "Material
to be scrapped at end user, please issue agreed upon scrap credit" in the
Freight section of the RMR.
Any
material returned to Almetals prior to this RMR being authorized and issued
will be denied entrance and returned to the end user at their own expense.
C.
Denial of Claim
Almetals
will issue a denial letter with explanation of our denial.
D.
Request for
Further Information
Almetals
will issue a letter requesting further information, detailing what the exact
problems we are having with issuing a disposition are.
VI.
Corrective
Action Request
Almetals
issues Corrective Action in a standard Sideways 8D format. If this is unacceptable, the end user must
notify Almetals of such in writing, not just send in
their own form. End user forms will not be filled in unless Almetals
has been notified in writing that the 8D is not sufficient. This notification in writing can be sent to Almetals in the same manner as the original claim as in
Section II.
VII.
Limitations of
Liability
Almetals
accepts no responsibility for rejected material in any form other than that
which was supplied, or the labor or costs to produce such forms, nor for any direct or consequential damages to anyone.
VIII.
Additional
Comments
Almetals
policy is to issue disposition in an expedient manner on all claims. To do so, we need to have our Claim Policy
followed.
Credit
on all accepted claims is issued upon receipt of the
material, or receipt of the Scrap Credit on issues where the disposition was
Scrap Out.
IX.
Oxidation Claims
No
oxidation claim will be honored if Almetals
is not notified within 30 days of receipt of the material.
No
condensation, or water stain claims will be honored on metal shipped Collect.
In
cases of Wet packages, very cold packages of aluminum, or distortion of Almetals Water Stain Sticker delivered on Prepaid shipments:
A.
It must be noted on Receiving paperwork at time of
receipt of material and immediately forwarded to Almetals
B. Wipe off excess moisture, and
C. Do not open packaging until metal has warmed to room temperature (in case of very cold packages of aluminum only)
No
condensation, or water stain claims will be honored if
Almetals Water Stain Sticker is not attached or, if
distorted, not noted on the Bill of Lading upon receipt of material.
Note:
The Almetals Water Stain Sticker is
placed on the outside of the package.
It has a large black dot in the center that will distort due to any
moisture contacting it. We utilize this
to determine if moisture has come in contact with the
package after the material left our building.
X.
Red
rust claims on steel will be investigated on a
case-by-case basis if Almetals is notified within 30
days of metal receipt. No rust claims will be honored
after 30 days of customer receipt.
|